Available Tools (Select then click Truck '🚛' to get):
Instructions
How to Play (Click to Expand/Collapse)
Goal: Install and connect gas appliances at the highlighted target locations (dashed borders) within time and budget.
Movement: Click any empty grid cell or pipe to move the Gas Fitter (🧑🏭) there.
Get Tools:
Select a tool button below (Pipe, Heater, etc.).
Move the Gas Fitter to the Supply Truck (🚛).
Click the Truck cell again. The tool cost is deducted, and the 'Carrying' status updates.
Placement:
Move the Gas Fitter to the desired cell.
Click the cell *again* while carrying the correct tool:
Place **Pipe** on empty cells or over other pipes.
Place **Appliances** (Heater, Burner, Boiler) *only* on their matching highlighted target location.
Placing an item uses the tool you're carrying.
Piping: Pipes automatically connect to adjacent pipes or components. Appliances need gas flow from the Source (🔥) via pipes. Connected components will glow/change color.
Complete Job: Once all target appliances are placed correctly AND connected, the 'File Report' button will appear. Click it to win.
View: Use "Toggle 3D View" for a different perspective.
Win/Lose: Finish before time/budget runs out and file the report. Failure results in helpful tips.
Current Theme:Industrial Gas Fitter
Welcome to PipeMaster Pro!
Ready to tackle some industrial gas fitting jobs? Select a level to start.
Theme: Industrial Gas Fitter
Job Complete & Report Filed!
Great work! The facility is operational. You completed the job successfully.
Job Failed!
You couldn't complete the work order!
Supervisor Notes:Review the requirements and try again.